 Specialty Spaces | | | | | | | | Specialty projects are those that tend to be non-repetitive in nature or that demand unique solutions. PEDCO’s in-depth programming process allows the design team to become quickly familiar with the business, process, or program that must be accommodated and incorporated into the building solution. Case Studies
 |
Marathon Laboratory PEDCO provided complete architectural and engineering design services for a new modern laboratory that improves productivity and promotes new efficiencies allowing Marathon to get their products to market. Download the full story here » |
 |
Cincinnati Recreation Commission Recreational Facility
Working with the Cincinnati Recreation Commission, PEDCO designed a new, zero depth pool and renovated the recreation center for the Community of Evanston. Download the full story here » |
 | Hotel Energy Savings Analysis PEDCO was contracted to provide energy savings calculations for a hotel developer for a new 111-room Holiday Inn Express. Download the full story here » |
 | Jorgensen Family YMCA
PEDCO designed the mechanical, electrical, and plumbing systems for a new 78,000 SF recreation building for The YMCA of Greater Fort Wayne utilizing a geothermal cooling system.
Download the full story here » |
 | P&G CETL Research & Development Facility PEDCO provided MEP programming, feasibility study, option analysis, design development, construction documents, construction administration, post start-up and commissioning services for a new Research and Development Facility in West Chester, Ohio. Download the full story here » |  | St. Maximilian-Kolbe This rapidly growing parish in suburban Cincinnati had outgrown its rectory offices, which were located in a basement space. To meet the needs of the growing parish, a 4,000 square foot expansion was designed. Download the full story here » | | | Types of Projects - Research Facilities
- Laboratories
- Security Centers
- YMCA's
- Training Centers
- Fitness Centers
- Postal Facilities
| |